Official opening of the Taftan gold extraction factory
According to the Public Relations Department of Pars Tamin Mines Development Company, the inauguration ceremony of the Taftan Gold Mining Factory was held via video conference, with the presence of Seyyed Sawlat Mortazavi, Minister of Labor and Social Welfare, and Aref Norouzi, CEO of Shasta.
The ceremony held at the Taftan Gold Mining Factory was attended by Davoud Shahraki, Deputy for Coordination of Economic Affairs of the Governorate of Sistan and Baluchestan, Ali Kord, a representative of the people of Sharif Khash and Nosrat Abad and Mirjaveh and Korin, Alireza Shahnavazan, Governor of Taftan in the Islamic Consultative Assembly, Naderi, CEO of Sadr Tamin, members of the board of directors of Sadr Tamin, Nouri, CEO and members of the board of directors of Pars Tamin Mines Development, and other senior officials of the province.
This project has been the largest gold industry in the east of the country to date, which will have long-term effects at the regional and national levels.
The construction of the Taftan Gold Extraction Factory, which was built and equipped with local engineering and equipment in 20 months, began in Ordibehesht 1401 (May 2022), and the first firing of the factory feed followed by a hot test after the installation of industrial equipment and structures took place in the winter of 1402 (January 2023). Finally, the project was put into operation in Esfand 1402 (March 2023).
The Taftan Gold Extraction Factory has been constructed with an initial annual production capacity of 423 kilograms of gold in the first phase and an increase in capacity to 1020 kilograms of annual production of gold bullion in the second phase and in the horizon of 1404 (April 2023).
The construction of the Taftan gold extraction plant was made possible by the investment of Sadr Tamin Holding (TASICO), the most strategic holding specialized in the mining and metal and non-metal mining industries and a subsidiary of the Social Security Investment Company (Shesta). With the approach of playing a pivotal role in the development and transformation of minerals and improving the quality of life of the people of the region, the investment in the Taftan gold extraction plant construction project was prioritized and implemented by Pars Tamin Mine Development Company, the executive arm of the holding.
The employment resulting from the entry of this industry into the region in Sistan and Baluchestan province is 1,500 direct and indirect jobs, which have been carried out in the early stages with priority given to the selection and recruitment of local workers through employment tests, specialized interviews, and in the final stage, specialized training classes in theory and practice.
It should be noted that the next stage of the gold development plan in this province is the design of a gold processing and extraction plant with a production capacity of 5 tons of gold bars, which has been started and will be put into operation in 1406, and the second stage will follow with a production capacity of 5 tons of bars per year in 1409.